Complete water, solar and waterproofing solutions for your home or site
From softened water and solar heating to rooftop solar power and leak-proof roofs and walls — one team, engineered and installed end to end.
Which solution fits your problem first
Match what's costing you the most — hard water, the power bill, or a leaking roof — to the right team at our company.
| Solution area | What it covers | Best suited for |
|---|---|---|
| Water solutions | Softener, solar heater, heat pump, pressure pump | Every home needing better, hotter or stronger water supply |
| SRTPV solutions | On-grid (BESCOM), off-grid, captive solar power | Homes, sites and businesses cutting electricity costs |
| Water proofing solutions | Roofs, walls, epoxy grouting | Buildings with leaks, seepage or ageing surfaces |
Our range of products
Ten products across three solution areas, each supplied, installed and serviced by our own team.
Water solutions
Water softener
Resin-bed softening removes calcium and magnesium hardness from the incoming supply.
Best for: homes with hard water damaging pipes and appliances.
Solar water heater
Evacuated-tube collectors absorb solar heat and warm an insulated storage tank.
Best for: roofs with daily hot-water demand.
Heat pump
Draws ambient heat from the air to warm water efficiently, day or night.
Best for: reliable hot water where roof space is limited.
Pressure pump
Boosts line pressure for consistent flow at every outlet.
Best for: upper floors and weak municipal pressure.
SRTPV solutions
On-grid (BESCOM)
Rooftop solar synced with the BESCOM grid through net metering.
Best for: subsidy-backed bill savings.
Off-grid
Solar panels paired with battery storage, independent of the grid.
Best for: remote sites and unreliable grid areas.
Captive
A dedicated solar plant sized to one commercial or industrial consumer.
Best for: factories and large campuses.
Water proofing solutions
Roofs
Membrane and coating systems sealed across the full roof slab.
Best for: terraces leaking before the monsoon.
Walls
Damp-proof sealing treatments for external and basement walls.
Best for: seepage-prone walls and damp patches.
Epoxy grouting
Chemical-resistant epoxy grout bonds tiles with a sealed, washable finish.
Best for: kitchens, tanks and floors exposed to water.
Our work by solution area
A look at completed installations across water, solar and waterproofing.
Water solutions
SRTPV solutions
Water proofing solutions
What we service and maintain
Installation is the start — our team also handles upkeep, repair and annual maintenance.
Water solutions
SRTPV solutions
Water proofing solutions
Results from the field
Detailed write-ups of real installations, by solution area.
Water solutions
SRTPV solutions
Water proofing solutions
Who we are
An engineering-led team delivering water, solar and waterproofing solutions end to end — from design to install to after-sales service.
Vision
To be the most trusted name in integrated water, solar and waterproofing solutions, recognised for engineering quality and long-term reliability.
Mission
To deliver efficient, durable and well-serviced installations that lower costs and protect every property we work on.
Goal statement
To expand our reach across water, solar and waterproofing while keeping installation quality and customer satisfaction central to every project.
ALMM certification & the PM Surya Ghar subsidy
Compliance protects you from low-quality imports and keeps your on-grid installation eligible for central assistance.
What is ALMM?
The Approved List of Models and Manufacturers, mandated by MNRE.
- List-I (Modules): finished PV modules approved on quality, reliability and warranty.
- List-II (Cells): regulates domestic manufacturing of the cells inside panels.
Verify before you buy
- Check the model number on your quote against the ALMM List-I registry at mnre.gov.in.
- Confirm the BIS registration code on the panel label.
PM Surya Ghar subsidies
Grid-tied installations qualify for direct Central Financial Assistance, tiered by capacity:
- Smaller capacities: direct subsidy for maximum initial relief.
- Mid-range capacities: additional subsidy per extra kilowatt.
- Larger capacities: capped ceiling subsidy.
Slabs are revised periodically — confirm current rates on the PM Surya Ghar portal before budgeting.
Three steps to get started
Site survey
- Assess water quality, roof area or wall condition
- Recommend the right product or system size
- Share a clear, itemised quote
Engineering & procurement
- Select certified equipment and materials
- Plan installation around your schedule
- Handle approvals where needed (e.g. BESCOM net-metering)
Install & support
- Complete installation and testing
- Hand over documentation and warranty
- Ongoing service and maintenance
On-grid vs. off-grid solar
On-grid (BESCOM)
Off-grid
Get in touch
Send an enquiry, or find us at our office and factory.